Sumy machine-builders coped with the next task within the framework of the contracts with the German company Ingenieurbüro R. Großmann GmbH & Co. KG. KG (IBG), making a lot of suction and discharge connections. They, as well as many other techniques, which are currently being manufactured in the workshops of the enterprise, will be used in the process of field modernization that is carried out by the Customer.
In particular, six connections have been made. The equipment has successfully passed the tests and in the coming days will be transferred for shipment.
According to Vladimir Andrienko, the head of the sales department of Sumy NPO, the manufactured connections will be used as part of centrifugal compressors at the medium pressure compressor station. “Gas from this station will be supplied to the gas drying plant (it is for its reconstruction that the company workers are now producing a number of complex technological units). There will be a process of absorbing excess moisture, after which, having reached the required level of the dew point, the flow of blue fuel will be directed to a high-pressure compressor station where the products of our trademark will also be presented. We are talking about the already produced 12 connections, as well as 6 inlet and outlet droplet separators, which are now being painted. Thus, Sumy NPO products will be used by the customer at all key stages of gas compression and natural gas treatment at the field being constructed, “said Mr. Vladimir Andrienko.