“Sumy NPO” PJSC has entered the final production stage for a part of condensate pumping equipment for the Belarus NPP.
According to specialists of the machine-assembly shop No.22, who are responsible for implementation of this project, three pumps of the lot are being prepared for shipment, and another three have successfully passed tests and are waiting for the conclusions of the final revision.
Per the terms of the contract, Sumy machine-builders need to manufacture and deliver to the facility the total of 12 powerful condensate pumps of the АКсВА 2000-100 and АКсВА 2200-220-2 types.